The rules
LOLER testing: how often, and what a thorough examination is
Updated
LOLER testing is the thorough examination regulation 9 of LOLER 1998 requires: at least every 6 months for equipment that lifts people and for lifting accessories, at least every 12 months for other lifting equipment, or to a written examination scheme.
When a thorough examination is due
- Before first use, unless the equipment is new and came with a declaration of conformity made not more than 12 months before it is put into service.
- After installation, and after assembly at a new site, where safety depends on how it was installed.
- At least every 6 months for equipment that lifts people and for lifting accessories such as slings and chains.
- At least every 12 months for other lifting equipment, such as forklifts, vehicle lifts and goods-only tail lifts.
- Or to an examination scheme drawn up by a competent person, instead of the fixed intervals.
- After exceptional circumstances liable to put the equipment's safety at risk.
These triggers are regulation 9 of the Lifting Operations and Lifting Equipment Regulations 1998.
Source: LOLER 1998, regulation 9 (legislation.gov.uk)
Is a load test part of it?
Not always. The thorough examination is a check for defects by a competent person, and testing is part of it only where the examiner decides it is needed. Where it is, the report must give the particulars of the test, under Schedule 1 of the regulations.
Source: LOLER 1998, Schedule 1 (legislation.gov.uk)
What the examiner must do
The person making the examination must tell the employer at once of any defect that is or could become a danger, make a written, authenticated report as soon as practicable, and send a copy to the enforcing authority where a defect carries an existing or imminent risk of serious injury.
Source: LOLER 1998, regulation 10 (legislation.gov.uk)
HSE's approved code of practice for LOLER is L113.